Prepare Walls and Floor

Preparation is the key to success in all aspects of life and tiling is no different. All walls should be clean, dry and primed before any work commences.

Prepare Walls and Floor

Waterproof Room

The room is then waterproofed. As a policy we will always apply at least two full coats of waterproofing. Should the area need a third this is done at no extra cost to the client. At Tile Right our waterproofing comes with a full 6 ½ year warranty, for you own piece of mind.

Waterproof Room

Lay Sand and Cement

On many renovations it is necessary to lay a sand and cement bed prior to tiling. Not only will this concrete bed protect your waterproofing but it will also allow the installation of a frameless and semi frameless shower screen, leaving you with a seamless transition between your shower and main bathroom floor.

Lay Sand and Cement

Tile Floor and Then Walls

The next step is to tile your floor and then your walls.

Tile Floor and Then Walls

Install Feature Tiles

We are now ready to install the feature tiles. These can really add the wow factor to a room.

Install Feature Tiles

Grout and Silicone Seal

Almost their now! The room is then grouted and silicone sealed. This finishing operation really does take some skill and attention to detail.

Silicone Seal

Shower Screen Is Now Installed

Finally the shower screen of your choice can be installed. While we do not provide this service we can certainly point you in the right direction.

Shower Screen Is Now Installed